Honeymoon Uranium Project
Boss Energy Limited (ASX: BOE | OTCQX: BQSSF) is an Australian-based uranium producer with two uranium mines operating in tier-one locations.
The Company’s flagship asset is its 100% owned Honeymoon Uranium Project in South Australia. Honeymoon is currently ramping up to an annual production rate of 2.45 million pounds of U3O8. In addition, there is significant potential to continue growing the inventory, mine life and cashflow at Honeymoon with substantial resources already established outside the existing mine plan. Increases in production would enable Boss to leverage the infrastructure at Honeymoon and further capitalise on the strong demand for uranium from reliable western suppliers.
Alta Mesa Project
Boss also owns a 30% interest in the Alta Mesa Uranium Project in Texas, USA. This project is ramping up towards an annual production rate of 1.5 million pounds of U3O8. Alta Mesa provides Boss with exposure to the growing U.S. uranium market, further diversifying its asset base and boosting its long-term growth prospects.
With a strong leadership team and a focus on leveraging cutting-edge technology and sustainable practices, Boss Energy is well-positioned to play a vital role in supplying uranium to meet the global demand for clean energy. As the world shifts towards a low-carbon future, Boss Energy’s operations at Honeymoon and Alta Mesa are poised to contribute significantly to the energy transition, supporting the nuclear power sector and helping to reduce global carbon emissions.
Investment opportunity
Australian and international institutional and retail investors are most welcome to invest in Boss Energy Ltd (ASX:BOE ; OTCQX:BQSSF).
Investor information
Financial information
Investment sought: Not applicable
Documents
No documents provided.
Project status update
Both the 100% owned Honeymoon Uranium Project in South Australia, and the 30% owned Alta Mesa Project in South Texas, are both ramping up operations to their nameplate production capacities.
Project dependencies
Honeymoon and Alta Mesa are both fully funded and fully permitted.
Technology utilised
In-situ Recovery (ISR) mining and Ion Exchange processing.
Project highlights
- Boss Energy has delivered two producing mines in two tier-one locations of South Australia and South Texas.
Project timelines
Expected start date
January 01, 2024
Expected end date
December 31, 2033
Funding round finish date
-